Search

亚威机械

YAWEI MACHINE

1688   |   E-MAIL

Add:No.88, Fuqian Road, Baidian Industrial Zone, Hai’an, Jiangsu
Tel:86-513-88402039
Fax:86-513-88405118

Copyright © 2017 Nantong Yawei Machinery Manufacture Co., Ltd. -- All Rights Reserved.  编号:苏ICP备12075774号 Powered by www.300.cn

PRODUCTS

Nantong Yawei Machinery Manufacture Co., Ltd.

Products

Belt conveyor

Affiliate classification
Details

Ⅰ、Brief introduction

  1.TD75 type belt conveyor is used for general purpose, mainly used in mining, metallurgy, chemical, coal, building materials, machinery, food, light industry, hydroelectric, transportation and other departments. It is suitable for conveying bulk materials with various shapes and granularity with specific gravity of 0.5-2.5 ton/m3, and also suitable for conveying piece items.

2.There are 6 kinds of conveying belt width of TD 75 type belt conveyor: 500mm, 650mm, 800mm, 1000mm, 1200mm, and
1400mm.
3.There are two kinds of conveying belt adopted for TD 75 type belt conveyor: ordinary rubber belt and plastic belt, suitable for the working environment within scope of -15℃ ~ +40 ℃. Rubber or plastic belt with feature of oil resisting, acid and alkali resisting shall be adopted when conveying material with content of acidic alkaline, oils and organic solvent.
4.It can be used for horizontal or inclined conveying, when conveyed in inclined upward direction, the allowed maximum dip angle β of different material refer to figure 1, and when conveyed in inclined downward direction, the allowed maximum dip angle is 80% of that value listed in figure 1. Ribbed belt conveyor can be selected and used when dip angle larger than that of figure 1 need to be adopted for conveying.
 
Material name
P
Material name
P
Lump coal
18
Wet concentrate
(water content 12%) 
20 22
Raw coal
20
Dry concentrate
18
Pulverized coal washing products (1)
21
Limestone after being sieved
12
Coke after being sieved
17
Dry sand
15°
0-25mm coke
18
Sand mixed with gravel
18 20
0-3mm coke
20
Quarry mining
20
0-350mm ore(2)
16
Wet mining
23
0-120mm ore
18
Salt
20
0—60mm ore
20
Foundry sand
24
40-80mm oil shale
18
Waste sand
20
20-40mm oil shale
20
Un-sieved stone
18
0-200mm oil shale
22
Cement
20
Dry soil
20
Bulk dry clay
15°—18°
Wet soil
20 23
Powdery dry clay
22

  Note: (1) Including clean cola, middings coal and tailing

      (2) Including ferrous metal, non-ferrous metal, rock and limestone etc.

Ⅱ、Parts name

1、 conveying belt 2、 upper supporting roller 3、 buffer supporting roller
4、 material guide plate 5、bend pulley 6、screw tension device
7、 tail bracket 8、landing leg 9、lower supporting roller
10、intermediate frame 11、headstock 12、driving pulley 13、hood

Ⅲ、Main technical parameters

Belt width mm
Belt velocity m/s
Maximum conveying capacity;
groove profile/parallel
Maximum dip angle
500
0.8,1,1.25,1.6,2,2.5
232/125
20
650
391/211
800
1,1.25,1.6,2,2.5,3.15
824/350
1000
1233/546
1200
1,1.25,1.6,2,2.5,3.15,4
2202/821
1400
2996/1117

Ⅳ、Operation of belt conveyor

  1.No load individual test shall be carried out when commissioning. Rubber belt running condition shall be adjusted and attention shall be paid to each part whether fault occurs during no load operation.

2.After no load test if in good condition, then full load running can be carried out according to regulated capacity and check whether it is in normal operation, and whether there is increase on bearing temperature, and then belt conveyor can be formally put into operation if no adverse phenomenon is found.
 
3.Conveyor has to be no-load started, and material feeding shall be carried out after equipment start-up, and if more than one conveyor is interlock running, then sequence start-up shall be started from discharging end, but shutdown shall be executed after full completion of material discharging.
 
4.Oversized rock or other heavy object exceeding required standard shall not be loaded on belt conveyor, otherwise will lead to falling down of objects or damage of machine parts.
 
5.During material feeding, it’s forbidden to make conveyed material fall on belt from overtop height.
 
6.When several conveyors are in combination use, their electric switches have to be interlocked so as to make the last conveyor shutdown at last.
Corresponding parameter set not found, please add it in property template of background
暂未实现,敬请期待
暂未实现,敬请期待
Previous article